Govoptes

S 182 · Northwest Energy Security Act

Read twice and referred to the Committee on Environment and Public Works.

Introduced
Jan 22, 2025
Latest action
Jan 22, 2025
Sponsor
Sen. James E. Risch [R-ID]
Policy area
Water Resources Development
Cosponsors
5

Summary

Northwest Energy Security Act This bill requires Federal Columbia River Power System (FCRPS) operations to be consistent with the preferred alternative in a 2020 environmental impact statement (EIS) decision that focuses on the operations, maintenance, and configuration of dams in the system rather than wild fish restoration. The system includes dams in the Columbia and Snake rivers in Oregon, Washington, Montana, and Idaho. Specifically, the Bureau of Reclamation, the Bonneville Power Administration, and the U.S. Army Corps of Engineers must operate the FCRPS consistent with the Columbia River System Operations Environmental Impact Statement Record of Decision dated September 2020. Thus, Reclamation, the Bonneville Power Administration, and the Army Corps must follow the EIS rather than the 2023 Resilient Columbia Basin Initiative—and a supplemental EIS proposed in 2024—that focus on wild fish restoration in the Columbia Basin. The EIS decision may be amended if each agency determines that (1) changes are necessary for public safety or electrical grid reliability, or (2) certain requirements in the decision are no longer necessary. Further, the bill requires statutory authorization for any structural modification, action, study, or engineering plan that (1) restricts FCRPS hydroelectric dam generation; or (2) limits navigation on the Snake River in Washington, Oregon, or Idaho.

Recent actions

  1. Jan 22, 2025 Read twice and referred to the Committee on Environment and Public Works.
  2. Jan 22, 2025 Introduced in Senate

Votes

No recorded votes are available for this bill.

Related pages